Beauregard Dam, Valgrisanche (AO)

Partial demolition works

This dam, following gravity arch type criteria, was built in the 50’s to create an enormous water reserve for hydroelectric use. The dam is considerably large but the water level is kept under maximum capacity for safety reasons. In fact, since from its testing the dam revealed serious issues related with the occurrence of a deep gravitational deformation being active on the left side.
Partial demolition works were undertaken which reduced the dam from 72 meters height to 20 meters height, with an amount of 160.000 m3 of concrete removal. The demolition works, that improved the panoramic side of the top end of the valley, were carefully monitored from the point of view of the produced vibrations.

Vibration and acoustic monitoring

Client CVA S.p.A. – Compagnia Valdostana delle Acque
Period 2012-2014
Works Amount 18 M€
Services
  • Site planning of the monitoring points
  • Installation of instruments – 4 channels MINISUPERGRAPH
  • Blast monitoring: seismic and acoustic waves
  • Data analysis and reporting
Related Projects
Richiesta Informazioni

Compila i seguenti campi per richiedere informazioni o una quotazione sui nostri servizi.

Not readable? Change text. captcha txt