Milan-Genoa High Speed/High Capacity Railway Line

The Terzo Valico dei Giovi

The Terzo Valico dei Giovi is a new High Speed /High Capacity railway line that allows to strengthen the connections of the Ligurian harbor system with the main railways lines in Northern Italy and the rest of Europe. The line makes part of the Rhine-Alps corridor, that is one of the strategic European transport network corridors (TEN-T core network).
The railway line is 53 km long, of which 36 km are tunnels crossing 14 municipalities between Liguria and Piedmont. The work consists of 5 lots with several tunnels crossing the Apennine chain, and is excavated by both traditional and mechanized methods. In the stretch of plain the works consist of trench sections and embankments.

Final design project : geology, hydrogeology, impact assessment

Client Rocksoil S.p.a. (on behalf of COCIV)
Period 2012-2015
Works amount 6 B€
Services
  • Geological-structural surveys
  • Geological modelling and geomechanical characterization
  • Stratigraphic, hydrogeological and hydrogeochemical analyses
  • Water balance catchment assessment
  • 3D simulation for impact and water inflows estimates
  • Asbestos hazard assessment
Related Projects
Richiesta Informazioni

Compila i seguenti campi per richiedere informazioni o una quotazione sui nostri servizi.

Not readable? Change text. captcha txt