Doubling of the railway line Taormina – Giampilieri Lot 2

The project deal with the doubling of the Taormina – Giampilieri line and the disposal of the existing one between Letojanni and Giampilieri. The total lenght is around 28.3 km, of which 25 km are underground. The projects foresee the excavation of 8 tunnels, single- and double-tube, of which 5 are drilled by means of TBM-EPB and 3 by means of traditional method. About 1,7 km consist of viaducts, 1 km of embankments and 190 m of trenchs.

Geological, geomorphological and hydrogeological study

Client Proger S.p.a ( on behalf of RFI – Rete ferroviaria Italiana)
Period 2021- in progress
Works Amount 1 Bn€
Services
  • Geological surveys
  • Geognostic investigation planning (vertical and directional boreholes, VSP and borehole seismic surveys, BHTV)
  • Geomechanical characterization
  • Hydrogeological monitoring data interpretation
  • Landslides hazard assessment
  • Water resource impact assessment
  • Assessment of the hydrogeological model of the Alì thermal system