GDP-GEOMIN is part of the JV that will provide the design for the Fortezza-Ponte Gardena railway line

GDP-GEOMIN is part of the JV that will provide the design for the Fortezza-Ponte Gardena railway line

RFI (Rete Ferroviaria Italiana) awarded the consortium WEBUILD SpA/Implenia Construction GmbH the contract for the quadruplication of the first lot of the Fortezza-Ponte Gardena railway stretch, representing the natural southern prosecution of the Brenner Base Tunnel.
GDP-GEOMIN is part of the designer’s group that will provide, on behalf of the constructor, the Final Design. Besides GDP-GEOMIN, the Joint Venture is composed by SWS Engineering SpA (leader), PINI Swiss Engineers S.r.l., S.I.Stn Studio Associato, M INGEGNERIA Studio Associato and S.I.F.EL. SpA.
The lot has a total length of 22.5 km and includes two double tube tunnels: the Scaleres Tunnel of 15.4 km and the Gardena Tunnel of 6.3 km. The contract is worth 1.2 billions of Euro and the forecasted construction duration is of seven years.

Request more information

Address: Via Vittorio Amedeo, 6 – 10121 Torino TO
Phone. +39.011.0361100
info@gdpconsultants.eu – info@geomin.it

Richiesta Informazioni

Compila i seguenti campi per richiedere informazioni o una quotazione sui nostri servizi.

Not readable? Change text. captcha txt