Doubling of the railway line Fiumefreddo – Taormina

The project deals with the doubling of the Fiumefreddo- Taormina line, the dismantlement of the present line between the Fiumefreddo plants and the connection of the Letojanni interconnection on the existing line. The total lenght is around 13.9 km (10 .3 km tunnel) in addition to 1.5 km of interconnection with the existing railway line at the Letojanni railway station. Near the town of Taormina, between pk 13 + 100 and pk 13 + 700, is planned the new Taormina underground station characterized by a single chamber with two sidewalks of 350 m length.

Geological, geomorphological and hydrogeological study

Client Proger S.p.a ( on behalf of RFI – Rete ferroviaria Italiana)
Period 2021- in progress
Works Amount 800 Bn€
Services
  • Geological surveys
  • Geognostic investigation planning (vertical and directional boreholes, VSP and borehole seismic surveys, BHTV)
  • Geomechanical characterization
  • Hydrogeological monitoring data interpretation
  • Landslides hazard assessment
  • Water resource impact assessment
  • 3D geological model of the Taormina railway station